An architecture decision record is not meeting minutes

JSBC Labs8 min read

The meeting happened; the rationale still disappeared

A programme chooses one Salesforce org instead of two after three workshops. Six months later, a new architect sees only the outcome in a slide deck: ‘single-org strategy approved’. The business growth assumptions, data-residency constraint, integration cost, rejected alternatives and trigger for reconsidering the decision are scattered across invitations, chat threads and personal notes. The choice survives, but the reasoning that made it responsible has vanished.

The JSBC Labs position is that an architecture decision record is not meeting minutes. Minutes document who attended and what was discussed. An ADR preserves one consequential choice in a form that can be reviewed, challenged and safely revisited. Salesforce Well-Architected guidance recommends storing significant ADRs in version control and capturing business drivers, technical constraints, alternatives, consequences, technical debt and revisit triggers. The record exists for the next decision-maker, not merely as proof that a meeting occurred.

Record the decision—not the conversation

A useful ADR starts with a short, unambiguous statement: what was decided, its scope and its status. ‘Use Platform Events for order-status notifications between Salesforce and the fulfilment service’ is a decision. ‘The team discussed event-driven integration’ is not. Avoid chronological transcripts, speaker-by-speaker summaries and copied workshop chat. They bury the architectural contract under material that future readers cannot apply.

Give every record a stable identifier, title, owner, decision date and status such as proposed, accepted, superseded or retired. Link it to the business capability, affected systems and delivery change. Keep the decision text immutable once accepted; when the architecture changes, supersede it with a new ADR and connect the two. History should show how thinking evolved without rewriting the evidence that governed an earlier release.

Set a threshold for what deserves an ADR

If every field and Flow element receives an ADR, the practice becomes administrative noise. If only multi-year strategy decisions qualify, daily architecture still disappears. Record choices that materially affect security, data authority, transaction boundaries, integration contracts, licensing, scale, operational ownership, portability or recovery. Also record deliberate exceptions to standards and decisions that create difficult-to-reverse coupling.

Use a lightweight test: will a reasonable future team ask why this approach exists, what would break if it changed or which assumption would invalidate it? If yes, write the record. Keep a minimal template for ordinary choices and a deeper format for high-risk decisions. The cost of documentation should match the blast radius and reversibility of the choice, not the seniority of the person requesting it.

Write context as constraints and evidence

Context is not a generic project introduction. State the forces that made the decision necessary: expected data volumes, peak concurrency, latency target, availability objective, regulatory boundary, user population, delivery window, skills, licence model and current system limitations. Distinguish verified facts from forecasts and name the source of each important number. ‘The integration must be fast’ gives no one a design boundary; ‘95% of accepted applications must appear in Salesforce within two minutes’ can be tested.

Salesforce Well-Architected guidance ties availability targets to business impact and warns against vague requirements such as ‘fast and reliable’. Apply the same discipline to governor-limit assumptions, storage growth, API demand and operational recovery. Record the date of volatile evidence, especially pricing and product capability. An ADR built on an assumption is still useful when the assumption is explicit and has an owner.

Show the alternatives that could genuinely have won

An ADR is weak when the chosen option receives three pages and alternatives receive one dismissive sentence. Compare credible approaches against the same decision criteria. For build-versus-buy work, include implementation effort, licence or subscription cost, maintenance, upgrade impact, integration complexity, exit cost and strategic differentiation. For platform design, compare security, scale, consistency, operability, delivery speed and reversibility.

Salesforce Architecture Decision Guides explicitly frame tool selection as trade-off analysis, while Well-Architected cost guidance calls for total-cost comparisons and documented assumptions. Do not manufacture a scoring model that disguises preference as mathematics. Explain weighting, uncertainty and disqualifying constraints. A rejected option may become the right answer when volumes, product capabilities or business priorities change; preserve enough evidence to recognise that moment.

Own consequences, residual risk and debt

Every architectural choice purchases benefits by accepting costs. Name both. A single-org strategy may simplify customer identity and reporting while increasing release coordination and data-partitioning complexity. An asynchronous boundary may protect interactive performance while introducing eventual consistency, reconciliation and new monitoring duties. Consequences should become backlog items, controls, service measures or explicit accepted risk—not prose that ends at approval.

Security ADRs should record requirements, evaluated alternatives, residual risks, compensating controls and monitoring, as Salesforce Well-Architected recommends. Cost decisions should show near- and long-term impact. Reliability choices should connect to measurable service objectives. Assign each material consequence to an accountable owner and due date. Approval without ownership merely transfers architectural debt to an unnamed future team.

Define when the decision must be revisited

‘Review annually’ is rarely enough. Define event-based triggers: transaction volume exceeds a threshold, a Salesforce capability becomes generally available, a licence contract changes, a country introduces a residency requirement, an error budget is exhausted or an integration partner retires an API. Also state which evidence must be collected before reopening the choice. This turns the ADR into a living guardrail rather than a historical verdict.

Do not edit an accepted decision simply because hindsight improved. Create a successor record that cites the original context, describes what changed and makes a new choice. A superseded ADR is valuable evidence: it explains why the old architecture was once rational and prevents teams from repeating an earlier analysis without understanding its conditions.

Put the record where delivery can enforce it

Store ADRs in version control close to the implementation they govern, as Salesforce Well-Architected advises. Review them through the same pull-request discipline as code and metadata. Link an accepted ADR from epics, interface specifications, threat models and runbooks. Add a release check for changes that cross a recorded boundary, and teach reviewers to ask whether an existing decision is being implemented, contradicted or superseded.

Architecture governance becomes faster when the record carries the argument. Review boards can focus on unresolved trade-offs instead of reconstructing history, developers can test against explicit constraints and leaders can see the cost of changing direction. The objective is not a larger documentation library. It is a smaller set of consequential decisions that remain understandable, accountable and reversible after the people in the original meeting have moved on.